View MODAF:AcV-1 Acquisition Clusters View

mod_logo_60.jpg

Overview

The AcV-1 Acquisition Clusters View is part of the MODAF Acquisition Viewpoint and one of the 47 MODAF views*.

Version & Date

Version 1.2.004.

* =  changed at 1.2.004

+ =  new at 1.2.004

The change history is derived from the definition of each MODAF view within the The MODAF Acquisition (AcV) Viewpoint viewpoint document from www.mod.uk/modaf.

See MODAF Release History.

Purpose*

From The MODAF Acquisition (AcV) Viewpoint p2:

AcV-1 provides an organisational-based perspective on how projects can be grouped together to achieve coherent programmes.

Subject to Crown Copyright

Background*

From The MODAF Acquisition (AcV) Viewpoint p2:

The AcV-1 depicts logical groupings of projects (into “clusters”), mapped to the organisations that manage them, in order to describe the portfolio of projects that contribute to a coherent acquisition programme. It provides a means of identifying the main dependencies between acquisition elements.

This view provides a means of analysing the main dependencies between acquisition elements.

Subject to Crown Copyright

Description*

From The MODAF Acquisition (AcV) Viewpoint p2:

The AcV-1 provides a way of describing the organisational relationships between multiple acquisition projects that deliver individual systems or capabilities as part of a wider programme. Consequently, it generally will not be developed by those building Architectures for an individual project.

In essence, AcV-1 is an organisational breakdown consisting of actual organisations (see OV-4, Operational Relationships Chart) in a hierarchical structure which groups the projects they manage to form acquisition clusters.

The view is strongly linked with StV-4, Capability Dependencies, which shows capability clusters and dependencies.

The intent of an AcV-1 is to show:

  • All of the acquisition projects delivering capability within the programme of interest.
  • The structure of acquisition projects.

An AcV-1 is specific to a particular Enterprise Phase – i.e. the structure of programmes may change over time as projects are merged, axed and the capability portfolio rebalanced. Hence, it is possible that an acquisition programme could have more than one AcV-1, each showing how the acquisition clusters are arranged for relevant Enterprise Phases.

Subject to Crown Copyright

Data Objects

From The MODAF Acquisition (AcV) Viewpoint p2:

The data in an AcV-1 can include:

MODAF_AcV1_simplifiedMM.jpg

Subject to Crown Copyright

Presentation

  • Topological (Connected Shapes)
  • Nested box Diagram
  • UML Composite Structure Diagram
  • UML Class Diagram

Subject to Crown Copyright

Configuration History

1.2.003 name changed to AcV-1 Acquistion Clusters

Original name SoS Acquisition Clusters

Comments

The list of data elements should include MODAF::Actual Organisation - shown in the fragment of the simplified metamodel fragment.

References

Other Frameworks

See also:

 

 

Category:Framework -> View
Category:MODAF -> View
Category:Acquisition

Categories:

 

© 2010 Eclectica Systems Ltd.